Main project introduction:
1. Turnkey project, including simulation design, manufacturing, field integration, etc;
2. 4 robots were replaced by 6 new KUKA robots, and the beat was greatly improved from 150s to 120s;
3. It meets the requirements of process, beat and welding quality, and overcomes the welding spot which is difficult to realize in the original manual position, and reduces the labor cost;